OVERVIEW

The storm drain line running down the south side of 1000 South currently drains into and ponds on private property in Lindon prior to overflowing into an irrigation canal. In order to eliminate this flooding, the 1000 South Storm Drain Project will extend the existing storm drain pipe in 1000 South from approximately 1300 East to 1150 East where it will drain directly into an existing irrigation and drainage system.

SCHEDULE

Project is scheduled to start in July 2020 and be completed by the end of August 2020.